Secured through open-book tendering and negotiation CDC was engaged as specialist contracting partner of choice to this global medical device manufacturing group.

 

Who we worked with

Principle Contractor √

Design & Build √

Live Site √

Contract Type JCT √

Project Planning √

Project Management √

Construction & Fit-out √

HVAC & Ventilation √

Piped Services √

Electrics √

Test & Commission √

Validation √

What we did

  • Project Type : Sachet Filling
  • Size : 650m2
  • Duration : 22 weeks

How we did it

Requiring fast-track delivery and constrained by tight fiscal and programme parameters, this full refurbishment project challenged CDC to design and construct over 650m² of controlled manufacturing facility suitable for licensing by the MHRA. With complete responsibility for the critical process mixing and storage installation as well all the cleanroom facilities and associated building services CDC provided a genuine turnkey service.

The facility refurbishment began with the partial strip out of the existing building. The application of specialist cleanroom wall finishes was used to line out the building and to create new internal production areas. 40,000 litres of mixing and storage provision together with sophisticated controls linked through to the filling lines was installed in parallel with large scale validated autoclave processing for final sterilisation.

Through professional, collaborative working CDC exceeded expectations ensuring the site will become a centre of manufacturing excellence for the group.