Secured through competitive tender this regional centre of excellence was fully designed, constructed and validated by CDC.

Who we worked with

Project Type : Pharmacy

Size : 800m2

Duration : 20weeks

What we did

Principle Contractor

Design & Build √

Live Site √

Contract Type JCT √

Project Planning √

Project Management √

Construction & Fit-out √

HVAC & Ventilation √

Piped Services √

Electrics √

Test & Commission √

Validation (MHRA) √

How we did it

Designed and developed incorporating segregated areas for the manufacture of both injectable and non-injectable products with specific processing including, Cytotoxics, TPN, Civas, biologics as well as radio-pharmacy operations.

Operating as a specialist sub-contractor within the framework of a larger facility construction by a leading Main Contractor; CDC’s responsibilities included direct liaison with the Trust user team to develop, agree, design and fully validate all aspects of the facility for MHRA regulatory compliance.

With CDC’s in-house team responsible for the specification and agreement of all architectural finishes along with the necessary engineering solution this provided the Trust a risk-free delivery strategy.