Developed in consultation with this prestigious research institute CDC successfully design developed, installed, tested, commissioned and finally validated this high-spec CL3 bio-containment unit.

Who we worked with

Project Type : CL3

Size : 80m2

Duration : 15weeks

Cost : £430,000

Details :

  • Principle Contractor √
  • Design & Build √
  • Live Site √
  • Contract Type JCT √
  • Project Planning √
  • Project Management √
  • Construction & Fit-out √
  • HVAC & Ventilation √
  • Piped Services √
  • Electrics √
  • Test & Commission √
  • Validation √

What we did

Utilising our extensive in-house expertise we worked closely with the client to specify and agree all architectural details and finishes to provide longevity in maintaining the physical bio-security measures. Working in conjunction with our engineering team all the critical HVAC control for negative room pressurisation was designed along with the facility autoclave provisions and specialist fumigation requirements.

How we did it

Working within a live building environment but spending only 15 weeks on site, our project management team closely supervised this critical installation. With the facility built to meet the requirements of the ACDP and LPS1175 this demanded a careful approach to construction. With particular regard being paid to the room fabric and integrated components as well as the associated building services as well as all electrics including facility lighting, small power, datacoms and fire protection, CDC provided a comprehensive service.